Mon – Sat: 8:00 AM – 6:00 PM +260 975 385 808
Home / Supplies / Heavy Duty Equipment

Supply of
Heavy Duty Equipment

Twenty machine classes across earthmoving, grading, haulage, compaction, concrete and site support — supplied, specified and supported for Zambian ground conditions. Every unit comes with its operating envelope stated up front, so the machine that arrives is the machine the job needs.
20Machine classes
6Fleet groups
48 hrWritten quotation
10Provinces supported
The Fleet

One Machine For Every Stage Of The Works

Equipment is grouped by what it actually does on site, not by manufacturer. Each class below lists the configuration, the working envelope and the variants we can supply — so a request can be matched to a specific machine rather than a general category.
01

Earthmoving

Dig, Load, Trench · 4 classes
TLB - Tractor Loader Backhoe
Earthmoving · Backhoe

TLB — Tractor Loader Backhoe

  • 1.0–1.4 m³ front loader bucket, 6.0 m backhoe dig depth
  • 4x4 equal wheels, 4.4–6.0 m loader dump height
  • Road-registered — travels between sites without a lowbed
2WD / 4WDExtradigSide-shiftTurbo
Supplied in: unit
Tracked Excavator
Earthmoving · Crawler

Tracked Excavator

  • 13–22 t operating weight, 0.6–1.0 m³ bucket
  • 5.7–6.7 m dig depth, 8.9–9.9 m reach
  • Steel tracks with rubber street pads for hard standing
13 t20 t22 t long-reach
Supplied in: unit
Short-Radius Excavator
Earthmoving · Close quarters

Short-Radius Excavator

  • 8–10 t, tail swing inside the track footprint
  • Works against a shoring wall or between live lanes
  • 0.3–0.45 m³ bucket, rubber or steel tracks
8 t10 tZero-tail
Supplied in: unit
Mini Excavator
Earthmoving · Compact

Mini Excavator

  • 1.5–3.5 t, 0.04–0.10 m³ bucket
  • 2.4–3.0 m dig depth, 2.5 m width with tracks retracted
  • Fits through a 1.0 m gate — yards, drains, footings
1.7 t2.8 t3.5 t
Supplied in: unit

The machines that move the ground itself. Tracked for soft and rough conditions, wheeled for hard standing and road travel.

02

Bulk Earthworks

Cut, Spread, Level · 3 classes
Motor Grader
Earthworks · Grading

Motor Grader

  • 3.1–3.7 m mouldboard, 12–15 t operating weight
  • Articulated frame, 6x4 or 6x6 drive, front scarifier
  • Cuts camber and drains to ±5 mm tolerance
12 t15 tAll-wheel drive
Supplied in: unit
Crawler Bulldozer
Earthworks · Dozing

Crawler Bulldozer

  • 13–22 t, 3.4–4.0 m straight or semi-U blade
  • Rear ripper for rock and hard laterite
  • Low ground pressure tracks for soft ground
D6 classD7 classRipper
Supplied in: unit
Wheel Loader
Earthworks · Loading

Wheel Loader

  • 1.8–3.5 m³ bucket, 14–20 t operating weight
  • 3.1–3.4 m dump clearance, 6.5 t breakout force
  • Loads tippers and feeds a plant hopper
L120 classL150 classHigh-tip
Supplied in: unit

Volume work and the finish behind it. Where a site has to be brought to level or a roadbed has to be built, this is the sequence.

03

Load & Haul

Move It Off Site · 4 classes
Articulated Dump Truck
Haulage · Off-road

Articulated Dump Truck

  • 20–30 t payload, 6x6 articulated chassis
  • Rated for soft, wet and unformed haul roads
  • Tipping body with a tailgate for controlled spread
20 t25 t30 t
Supplied in: unit
Tipper Truck
Haulage · Road

Tipper Truck

  • 10–20 m³ body, 6x4 or 8x4 configuration
  • Road-legal for public haulage and deliveries
  • Steel or Hardox body for rock and demolition spoil
6 m³10 m³20 m³
Supplied in: unit
Skid-Steer Loader
Load & Haul · Compact

Skid-Steer Loader

  • 0.4–0.6 m³ bucket, 700–1,100 kg rated capacity
  • Zero-radius turning in a tight yard or shed
  • Quick-attach plate for forks, sweeper and breaker
700 kg1,100 kgTracked
Supplied in: unit
Telehandler
Load & Haul · Lifting

Telehandler

  • 3.5–4.5 t lift, 7–17 m telescopic reach
  • Forks, bucket, jib and work platform attachments
  • Reaches upper floors without a crane
7 m14 m17 m
Supplied in: unit

Once material is loose it has to travel. Haul units matched to the ground conditions and the tonnage, plus the handling plant around them.

04

Compaction

Get The Density · 4 classes
Single-Drum Vibratory Roller
Compaction · Soil

Single-Drum Vibratory Roller

  • 11–20 t, 2.1 m drum width, 28–33 Hz vibration
  • Granular fill, sub-base and rock fill layers
  • Padfoot drum shell available for cohesive soil
11 t15 tPadfoot
Supplied in: unit
Pneumatic Tyre Roller
Compaction · Seal

Pneumatic Tyre Roller

  • 9–27 t ballasted, 7 or 9 smooth rubber tyres
  • Seals the surface and kneads asphalt without crushing aggregate
  • Variable tyre pressure for layer thickness
9 t16 t27 t
Supplied in: unit
Tandem Asphalt Roller
Compaction · Asphalt

Tandem Asphalt Roller

  • 1.5–3.0 t static per drum, 1.3–1.7 m drum width
  • Asphalt, base course and surface course
  • Dual amplitude with a water spray bar
1.5 t2.5 t3.0 t
Supplied in: unit
Trench Roller
Compaction · Trench

Trench Roller

  • 0.7–1.5 t, 600–800 mm drum width
  • Compacts a trench, service strip or kerb line
  • Walk-behind or remote-controlled
600 mm800 mmRemote
Supplied in: unit

Density is what stops a road failing in the first rainy season. Roller selection follows the material, the layer thickness and the access width.

05

Concrete & Lifting

Pour And Place · 3 classes
Concrete Mixer Truck
Concrete · Transport

Concrete Mixer Truck

  • 6–10 m³ drum, 3 or 4 axle carrier
  • Drum speed and slump held to the pour specification
  • Rear discharge chute with an extension hopper
6 m³8 m³10 m³
Supplied in: unit
Concrete Boom Pump
Concrete · Placement

Concrete Boom Pump

  • 28–47 m placing boom, 60–160 m³/h output
  • Reaches over formwork and behind obstructions
  • Outriggers set on timber pads or steel plates
28 m36 m47 m
Supplied in: unit
Mobile Telescopic Crane
Lifting · Mobile

Mobile Telescopic Crane

  • 25–80 t lifting capacity, 4-section telescopic boom
  • Full outrigger spread for the rated load chart
  • Lift plan and operator certification supplied
25 t50 t80 t
Supplied in: unit

Getting concrete from the truck to the form, and steel or plant to where it has to sit.

06

Site Support

Keep The Site Running · 2 classes
Water Bowser
Support · Water

Water Bowser

  • 5,000–20,000 litre tank, gravity or pump spray bar
  • Dust suppression on haul roads and access
  • Water for compaction, curing and wheel wash
5,000 L10,000 L20,000 L
Supplied in: unit
Mobile Lighting Tower
Support · Lighting

Mobile Lighting Tower

  • 4 × 1,000 W LED floodlights on a 9 m mast
  • Diesel generator, 60–90 h run time per tank
  • Trailer-mounted with four stabiliser legs
9 m mastLEDDiesel
Supplied in: unit

The plant that quietly decides whether the day is productive — dust control, water for compaction, and light to work past sunset.

Selection Table

Which Machine, For Which Job

The operating envelope of every class on the fleet, side by side. Use this to sanity-check a request before it reaches us — if the weight or the reach does not fit the site, the class is wrong.
Machine Operating weight Bucket / capacity Max depth or reach Best for
TLB7.5–9 t1.0–1.4 m³6.0 mMixed trenching, loading and travel between sites
Tracked excavator13–22 t0.6–1.0 m³6.7 mBulk digging, foundations, demolition, rock
Short-radius excavator8–10 t0.3–0.45 m³4.5 mConstrained sites, live roads, shored trenches
Mini excavator1.5–3.5 t0.04–0.10 m³3.0 mDrains, service trenches, confined access
Motor grader12–15 t——Roadbed shaping, camber, final level
Crawler bulldozer13–22 t3.4–4.0 m blade—Clearing, bulk push, ripping rock
Wheel loader14–20 t1.8–3.5 m³—Loading tippers, stockpiles, plant feed
Articulated dump truck20–30 t payload11–18 m³—Off-road haul on soft or unformed roads
Tipper truck10–20 m³10–20 m³—Road haulage, deliveries, spoil removal
Skid-steer loader700–1,100 kg0.4–0.6 m³—Tight yards, sweeping, indoor work
Telehandler3.5–4.5 t lift—17 m reachMaterials to height without a crane
Single-drum roller11–20 t2.1 m drum—Sub-base and granular fill compaction
Pneumatic roller9–27 t7–9 tyres—Surface sealing, asphalt kneading
Tandem roller1.5–3.0 t1.3–1.7 m drum—Asphalt base and surface course
Trench roller0.7–1.5 t600–800 mm—Trenches, kerb lines, service strips
Concrete mixer6–10 m³6–10 m³—Delivering specified concrete to the pour
Boom pump28–47 m60–160 m³/h47 mPlacing concrete over formwork and obstacles
Mobile crane25–80 t——Lifting steel, precast and plant
Water bowser5,000–20,000 L——Dust suppression, compaction water, curing
Lighting tower4 × 1,000 W9 m mast—Night work and early-morning pours
Task Match

Tell Us The Task, We Will Name The Plant

Most enquiries start with a job rather than a machine. This is the mapping our estimators work from — the same table used to build a plant schedule for a tender.
Task Plant we would put on it
Bulk cut and fillExcavator, bulldozer, ADT, grader, roller
Roadbed and camberGrader, single-drum roller, water bowser
Foundation and footing excavationTracked or short-radius excavator, TLB
Service trenches and drainsMini excavator, TLB, trench roller
Loading tipper trucksWheel loader, excavator
Material haul on soft groundArticulated dump truck
Spoil removal off siteTipper truck, wheel loader
Compacting sub-baseSingle-drum roller, pneumatic roller
Asphalt surfacingTandem roller, pneumatic roller
Placing concrete at heightBoom pump, mobile crane
Moving materials to upper floorsTelehandler
Tight-yard or indoor workSkid-steer, mini excavator
Night work and dust controlLighting tower, water bowser
Attachments

One Carrier, Many Jobs

Half the value of an excavator or a telehandler sits in what you hang off the end of it. Attachments are matched to the carrier’s hydraulic flow and pin size — an oversized breaker will destroy a machine faster than any rock will.
Wheel loader with bucket
Attachment Range

What We Can Hang Off It

Six attachment families cover almost every task a carrier will be asked to do on a building or civils site.
01

Buckets

General-purpose digging, ditching, trenching, grading and rock buckets, plus a 4-in-1 for clearing and backfill.

02

Hydraulic breakers

Percussive hammers for concrete, rock and asphalt, sized to the carrier so the breaker cannot out-work the machine.

03

Augers

Continuous-flight earth augers for pile bores, post holes and drainage, with extension stems for depth.

04

Rippers & scarifiers

Single and multi-shank rippers for laterite and weathered rock; front scarifiers for roadbed preparation.

05

Forks & grapples

Pallet forks, manure forks and scrap grapples for handling timber, steel and demolition debris.

06

Compaction plates

Vibratory plate and trench-pad attachments for areas a roller cannot reach along kerbs and walls.

In Detail

The Fleet, Up Close

Every class photographed as it is presented — so what arrives matches what was specified.
Supply Terms

How Supply Works

Equipment can be bought outright or taken on a term hire with maintenance included. Either way the machine is presented with its service history and its operating limits written down.
01

Specification

Send the task, the ground conditions and the access width. We come back with the class, the configuration and the attachment set — not a generic quote.

02

Presentation

Every unit is supplied serviced, with fluids checked, safety decals intact and an operator handover on the controls and the load chart.

03

Support

Wear parts, hoses and filters held as repeat supply, with a service interval agreed at handover and recorded per machine.

Ground conditions decide the machine, not the price list. Laterite, black cotton soil and wet season haul roads each punish the wrong choice differently. Tell us where the machine is going and we will specify for it.

Need Plant On Site?

Send us the task, the ground and the access — we will come back with the machine class, the attachments and a written rate.